Projects for Petronas

Projects CNG Filing Facility - The City of Red Deer

Project Gallery

Projects for Petronas

  • Steel fabrication – 4 pipe rack modulars & 103006 KG off mod structural fabrication 
  • Pipe Fabrication – B-32-C Water hub – 3223 FDWI 2” to 16” piping 
  • Site Installs – B-32-c water hub – Set buildings, install structural, install piping. Well Pad projects – Set buildings, install structural, install piping.
  • Riser modification project – Fabricated piping, demo old piping onsite, install piping. Supply operators, labours, and foreman for tommy lake road pipeline project
  • Vegetation Management – Spray, pick, machine remove and blacken roughly 1,000 sites

Summary

Discover how we gave this startup a fresh visual start. With over 50 team members, 5000+ users and 27M, it was time to replace their outdated look with a design that matched their ambitions.

They are the Berlin-based Series A startup on its way to becoming the leading finance platform for SMEs, freelancers, and self-employed persons.

Get in touch with us

Let's Make Something Great Together